Start: Third
Qtr 2002
Completed: Fourth
Qtr 2004
This work is to conduct a riverbank and channel bank slope stability analysis to determine intrusion into or effect on adjacent lands or structures.
The engineering analysis has been finished. The results will be available as part of the Draft General Reevaluation Report to be issued by
the US Army Corps of Engineers.
None.